Multilevel Feedback Queues Scheduling
Multilevel Feedback Queue Scheduling
Definition: Multilevel Feedback Queue Scheduling is an advanced version of Multilevel Queue Scheduling where processes can move between queues based on their behavior and requirements. It aims to dynamically adjust priorities to optimize both CPU-bound and I/O-bound processes.
Key Features:
Queue Structure: Multiple queues, each with its own priority level and scheduling algorithm
Dynamic Process Movement:
- Demotion: A process that uses too much CPU time is moved to a lower-priority queue.
- Promotion: A process that waits too long in a low-priority queue is moved up — this is aging, to prevent starvation.
- Behavior-Based Scheduling:
- CPU-bound processes tend to move down
- I/O-bound or interactive processes stay at higher priorities
- Adaptivity: Better response time for interactive jobs while ensuring fairness for all
Defined By:
- Number of Queues
- Scheduling Algorithm per Queue (e.g., RR for top, FCFS for bottom)
- Rules for Promotion
- Rules for Demotion
- Initial Queue Assignment
Gantt Chart Example
Queue Setup
- Q0 (Priority 1) — Round Robin, Quantum = 2
- Q1 (Priority 2) — Round Robin, Quantum = 4
- Q2 (Priority 3) — FCFS
Rules
- New processes enter Q0
- If a process uses full quantum in Q0 → move to Q1
- If it uses full quantum in Q1 → move to Q2
- If it waits too long in Q2 → move up to Q1 (aging)
Given:
Process | Arrival Time | Burst Time |
---|---|---|
P1 | 0 | 6 |
P2 | 1 | 4 |
P3 | 2 | 9 |
Assumptions:
- All processes enter Q0
- Apply feedback rules for demotion
Execution Breakdown:
- t=0–2: P1 (Q0) uses full quantum → demote to Q1
- t=2–4: P2 (Q0) uses full quantum → demote to Q1
- t=4–6: P3 (Q0) uses full quantum → demote to Q1
- t=6–10: P1 (Q1, 4 units quantum) → finishes (remaining 4 units)
- t=10–12: P2 (Q1, remaining 2 units) → finishes
- t=12–16: P3 (Q1, 4 units) → uses full quantum → demote to Q2
- t=16–21: P3 (Q2, remaining 3 units) → finishes
Gantt Chart
gantt title Multilevel Feedback Queue Scheduling dateFormat X axisFormat %s section Q0 (RR, q=2) P1 (2) :p1a, 0, 2 P2 (2) :p2a, 2, 4 P3 (2) :p3a, 4, 6 section Q1 (RR, q=4) P1 (4) :p1b, 6, 10 P2 (2) :p2b, 10, 12 P3 (4) :p3b, 12, 16 section Q2 (FCFS) P3 (3) :p3c, 16, 19
Calculations
Process | Arrival | Burst | Completion | Turnaround | Waiting |
---|---|---|---|---|---|
P1 | 0 | 6 | 10 | 10 - 0 = 10 | 4 |
P2 | 1 | 4 | 12 | 12 - 1 = 11 | 7 |
P3 | 2 | 9 | 19 | 19 - 2 = 17 | 8 |
Averages
- Average Waiting Time = (4 + 7 + 8) / 3 = 6.33
- Average Turnaround Time = (10 + 11 + 17) / 3 = 12.67